Our articles

TitleOutputAuthorsLanguage
Torsional vibrations of the rotating parts of the hydraulic unit during transient processes of hydroelectric power plantsGidrotekhnicheskoe Stroitel'stvo, 2018, № 8Muravyov O.A.Russian
Switching capabilities of the units of pumped storage hydroelectric power stations with asynchronized synchronous motor generatorPower Technology and Engineering. 2018. Vol. 51, No 6Berlin V.V., Murav'ev O.A.English
Maneuverability of PSPP units with asynchronized synchronous motors-generatorsGidrotekhnicheskoe Stroitel'stvo, 2017, № 10Berlin V.V., Muravyov O.A.Russian
Startup of Pumping Units in Process Water Supplies with Cooling Towers at Thermal and Nuclear Power PlantsPower Technology and Engineering. 2017. Vol. 50, No 6Berlin V.V., Murav'ev O.A., Golubev A.V.English
Startup of Pumping Units in Process Water Supplies with Cooling Towers at Thermal and Nuclear Power PlantsGidrotekhnicheskoe Stroitel'stvo, 2016, № 10Berlin V.V., Muravev O.A., Golubev A.V.Russian
Review of the article by V.S. Seleznev, V.B. Kurzin, A.V. Liseykina, P.V.Gromyko "About natural acoustic oscillations in the conduits of hydroturbines of the Sayano-Shushenskaya HPP"Gidrotekhnicheskoe Stroitel'stvo, 2016, № 7Berlin V.V., Muravyov O.A.Russian
Modeling of technological modes of regulation of HPP and PSPP unitsCollection of materials of the International Scientific Conference. Integration, partnership and innovation in construction science and education.
M .: MGSU, 2015
Berlin V.V., Muravyov O.A.Russian
Gowerning the turbine-generator unit of small-scale hydropower plant with a long penstockPower Technology and Engineering. 2015. Vol. 49. № 4Berlin V.V., Murav'ev O.A.English
Gowerning the turbine-generator unit of small-scale hydropower plant with a long penstockGidrotekhnicheskoe Stroitel'stvo, 2015, № 5Berlin V.V., Muravyov O.A.Russian
Resonance in pressure systems of hydroelectric power plants with surge tanksSafety of energy facilities. Scientific, technical and industrial collection. Issue 2 (20).
M .: OAO NIIES, 2015
Berlin V.V., Muravev O.A., Golubev A.V.Russian
Review of the article by G. V. Glazyrin “Minimization of the amplitude of power fluctuations caused by water hammer, while controlling the unit of a hydroelectric power station”Gidrotekhnicheskoe Stroitel'stvo, 2015, № 2Berlin V.V.Russian
Resonances in the penstocks of an HPPPower Technology and Engineering. 2014. Vol. 47, №6Murav'ev O.A.English
Load drops at high-head pumped storage power plants with branched conduitsPower Technology and Engineering. 2014. Vol. 48. № 1Berlin V.V., Murav'ev O.A.English
Automatic detection of rupture of the penstok on the parameters of the transition process in the turbine
Gidrotekhnicheskoe Stroitel'stvo, 2014, № 12Berlin V.V., Muravyov O.A.Russian
Load drops at high-head pumped storage power plants with branched conduitsGidrotekhnicheskoe Stroitel'stvo, 2013, № 12Berlin V.V., Muravyov O.A.Russian
Low-frequency pressure pulsations and features of resonance in pressure conduits of hydroelectric power plantsSafety of energy facilities. Scientific, technical and industrial collection. Issue 18.
M .: OAO NIIES, 2013
Berlin V.V., Muravev O.A., Golubev A.V.Russian
Study of resonances in pressure conduits of hydroelectric power plantsGidrotekhnicheskoe Stroitel'stvo, 2013, № 10Muravyov O.A.Russian
Resonance phenomena in pressure conduits and draft tubes at HPPPower Technology and Engineering. 2013. Vol. 46. № 5Berlin V.V., Murav'ev O.A.English
Dynamic characteristics of an orthogonal turbine and output-control systems for TPP with high-voltage frequency converterPower Technology and Engineering. 2012. Vol. 45. № 6Berlin V.V., Murav'ev O.A., Golubev A.V.English
Investigation of resonant phenomena in penstocks and draft tubes of hydroelectric power stationsGidrotekhnicheskoe Stroitel'stvo, 2012, № 7Berlin V.V., Muravyov O.A.Russian
About V.N. Tarasov "Hydroelastic oscillations of hydroelectric power plants"Gidrotekhnicheskoe Stroitel'stvo, 2012, № 1Berlin V.V., Muravyov O.A.Russian
Dynamic characteristics of an orthogonal turbine and output-control systems for TPP with high-voltage frequency converterGidrotekhnicheskoe Stroitel'stvo, 2011, № 10Berlin V.V., Muravev O.A., Golubev A.V.Russian
Effect of turbine-operating regime and adjustment of automated control system on stability and critical area of surge tanks at HPPPower Technology and Engineering. 2011. Vol. 45. № 1Muravev O.A.English
Technical aspects of the failure of the second generating set at the Sayano-Shushenskaya HPPPower Technology and Engineering. 2010. Vol. 44. № 4Berlin V.V., Murav'ev O.A.English
Effect of turbine-operating regime and adjustment of automated control system on stability and critical area of surge tanks at HPPGidrotekhnicheskoe Stroitel'stvo, 2010, № 11Muravyov O.A.Russian
Technical aspects of the failure of the second generating set at the Sayano-Shushenskaya HPPGidrotekhnicheskoe Stroitel'stvo, 2010, № 5Berlin V.V., Muravyov O.A.Russian
Methods of substantiation of the parameters and modes of operation of TPP with orthogonal turbinesBulletin of MGSU. 2010. № 4-2Muravyev O.A., Savchenkov D.S.Russian
Water and energy aspects of the operation of tidal power plants as part of energy complexesBulletin of MGSU. 2010. № 4-2Muravyev O.A., Berlin V.V., Savchenkov D.S.Russian
Field tests of Kaplan turbines of HPP-34 of the Mozhaisk hydroelectric complexBulletin of MGSU. 2008. № 1Berlin V.V., Muravev O.A., Ermakov I.V., Golubev A.V.Russian
Water hammer in the pressure conduits of hydroelectric power stations during seismic effectsBulletin of the Department of Construction Sciences of the Russian Academy of Architecture and Construction Sciences. 2004. № 8Karelin V.Ya., Berlin V.V., Muraviev O.A.Russian
Analysis of the power modes during combined operation of hydraulic and solar electric generating plantsGidrotekhnicheskoe Stroitel'stvo, 2002, № 7Murav'ev O.A., Khamandzhoda U., Volshanik V.V.English
Experience in setting up a group frequency control system and active power of the Kureyskaya HPP operating in an isolated power systemCollection of scientific papers on the 70th anniversary of the Faculty of hydraulic engineering and special construction MGSU, edited by M.G. Zertsalov. M .: MGSU, 2001Berlin V.V., Muravyov O.A.Russian
Reliability of operation of technical water supply systems of thermal power plants and nuclear power plants when starting pumping unitsCollection "Construction in the XXI century. Problems and Prospects." Materials of the international scientific-practical conference. M .: MGSU, 2001Karelin V.Ya., Berlin V.V., Muraviev O.A., Kosolapova T.V.Russian
Characteristic Features of the Startup of Pump Units in Process-Water-Supply Systems for Thermal and Atomic Electric Power Plants with Long Conduits and Large Lower-Pool FluctuationsGidrotekhnicheskoe Stroitel'stvo, 2000, № 11Berlin V.V., Muravyov O.A.Russian
Characteristic Features of the Startup of Pump Units in Process-Water-Supply Systems for Thermal and Atomic Electric Power Plants with Long Conduits and Large Lower-Pool FluctuationsPower Technology and Engineering. 2010. Vol. 34. № 11Berlin V.V., Muravev O.A.English
On the use of stabilizing capabilities of control systems of HPP units for increasing the stability of modes and drastically reducing the size of the surge tanksBulletin of the Department of Construction Sciences of the Russian Academy of Architecture and Construction Sciences. 2000. No. 3Karelin V.Ya., Berlin V.V., Muraviev O.A.Russian
The stability of the HPP at small areas of the cross-section of the surge tanksProceedings of higher educational institutions. Building. 1997. No. 6 (462)Karelin V.Ya., Berlin V.V., Muraviev O.A.Russian
Characteristics of the joint operation of the Teribersky Hydroelectric Power Station in the regulation of frequency and powerPower stations. 1997. № 10Berlin V.V., Muravyov O.A., Palumbo V.M., Kosolapova T.V., Matveev V.A.Russian
Improving the quality of regulation of units of the Upper Teriberskaya HPP during load dropsPower stationsи. 1996. № 8Berlin V.V., Muravyov O.A., Palumbo V.M., Kosolapova T.V., Matveev V.A.Russian
The choice of design modes in the design of surge tanks of hydroelectric power plantsProceedings of higher educational institutions. Building. 1995. № 12Karelin V.Ya., Berlin V.V., Muraviev O.A.Russian
Stability of operation of HPP with downstream surge tanksGidrotekhnicheskoe Stroitel'stvo, 1995, № 4Berlin V.V., Muravyov O.A.Russian
Transient processes at hydroelectric power plants with surge tanksBook, Moscow, 1991Berlin V.V., Muravyov O.A.Russian
Development of mathematical methods of investigating transients in surge tanks of hydroelectric stationsGidrotekhnicheskoe Stroitel'stvo, 1986, Vol. 20, № 8Murav'ev O.A.English
Development of mathematical methods of investigating transients in surge tanks of hydroelectric stationsGidrotekhnicheskoe Stroitel'stvo, 1986, № 8Muravyov O.A.Russian
Optimization of design parameters of complex types of surge tanksGidrotekhnicheskoe Stroitel'stvo, 1984, № 4Arshenevsky N.N., Berlin V.V., Muravev O.A.Russian
Mathematical modeling of hydraulic regimes in the interface unit of the surge tank with the conduitsGidrotekhnicheskoe Stroitel'stvo, 1984, № 3Arshenevsky N.N., Berlin V.V., Muravev O.A.Russian
Features of regulation modes of HPP units with long pressure conduitsM .: MISI, 1976Berlin V.V.Russian
Comprehensive field studies of units and pressure conduits of the Khramskaya HPP-2Gidrotekhnicheskoe Stroitel'stvo, 1969, № 5Krivchenko G.I., Arshenevsky N.N., Klabukov V.M., Berlin V.V.Russian